M Vertica, Cheras

The project involves the demolition of the Tun Razak Badminton Complex, hostel, and surau to construct the Pangsapuri Suites, which will be completed in two phases. Phase 1 includes two residential blocks: Block A with 54 floors comprising 808 units and two levels of retail and lobby spaces at the ground and first floors, and Block B with 53 floors comprising 685 units and similar retail and lobby facilities. Additionally, Phase 1 features a 10-story parking podium (Podium A) equipped with residential and recreational amenities on its top floor (Level 11). Phase 2 consists of three residential blocks: Block C with 54 floors and 752 units, Block D with 53 floors and 793 units, and Block E with 54 floors and 646 units, all including two levels of retail and lobby spaces at the ground and first floors. This phase also incorporates a 10-story parking podium (Podium B) with residential and recreational facilities on its top floor (Level 11).

CLIENT

M Vertica Sdn. Bhd. (Mah Sing Group)

COMPLETION STATUS

Complete

START DATE

April 2018

END DATE

October 2019

LOCATION

W.P. Kuala Lumpur

SCOPE OF WORK

Bored Pile, Pilecap

PROJECT TYPE

Buildings - Residential - Suite Apartment

M Vertica, Cheras

The project involves the demolition of the Tun Razak Badminton Complex, hostel, and surau to construct the Pangsapuri Suites, which will be completed in two phases. Phase 1 includes two residential blocks: Block A with 54 floors comprising 808 units and two levels of retail and lobby spaces at the ground and first floors, and Block B with 53 floors comprising 685 units and similar retail and lobby facilities. Additionally, Phase 1 features a 10-story parking podium (Podium A) equipped with residential and recreational amenities on its top floor (Level 11). Phase 2 consists of three residential blocks: Block C with 54 floors and 752 units, Block D with 53 floors and 793 units, and Block E with 54 floors and 646 units, all including two levels of retail and lobby spaces at the ground and first floors. This phase also incorporates a 10-story parking podium (Podium B) with residential and recreational facilities on its top floor (Level 11).

COMPLETION STATUS

Complete

LOCATION

W.P. Kuala Lumpur

SCOPE OF WORK

Bored Pile, Pilecap

PROJECT TYPE

Buildings - Residential - Suite Apartment